olzpro.blogg.se

Lift plan for mobile cranes
Lift plan for mobile cranes













lift plan for mobile cranes lift plan for mobile cranes

Anchored bridging means that the steel joist bridging is connected to a bridging terminus point.īolted diagonal bridging means diagonal bridging that is bolted to a steel joist or joists.īridging clip means a device that is attached to the steel joist to allow the bolting of the bridging to the steel joist.īridging terminus point means a wall, a beam, tandem joists (with all bridging installed and a horizontal truss in the plane of the top chord) or other element at an end or intermediate point(s) of a line of bridging that provides an anchor point for the steel joist bridging.Ĭhoker means a wire rope or synthetic fiber rigging assembly that is used to attach a load to a hoisting device.Ĭold forming means the process of using press brakes, rolls, or other methods to shape steel into desired cross sections at room temperature.Ĭolumn means a load-carrying vertical member that is part of the primary skeletal framing system.















Lift plan for mobile cranes